IQ / OQ / PQ Protocol Templates

Battle-tested IQ, OQ and PQ protocol templates — configurable to your system class and CSA risk.

Quick chat on WhatsAppFree to read in fullNo form to read anything
Read the checklist
IQ templateOQ templatePQ templateIQ OQ PQ templates
In short

IQ, OQ and PQ are the three qualification stages of computer system validation. Installation Qualification confirms the system was installed as designed. Operational Qualification verifies each function against acceptance criteria defined in advance. Performance Qualification demonstrates the system works in the real operational context, with actual users, representative data volumes and genuine business processes.

Validation planReported inValidation summary report
User requirements (URS)verified byPerformance qualification (PQ)
Functional specification (FS)verified byOperational qualification (OQ)
Design specification (DS)verified byInstallation qualification (IQ)
Build and configure the system
Risk assessment at every stageTraceability matrix links each row
The V-model under GAMP 5: each specification on the left is verified by the qualification on the right, and the traceability matrix links every row. Risk assessment runs through all of it.

What every protocol must contain, whatever the stage

These sections are common to IQ, OQ and PQ. A protocol missing any of them is difficult to defend regardless of how well the testing was executed.

  • 1

    Purpose and scope

    What is being qualified, what is deliberately excluded, and why.

  • 2

    System and environment identified

    Exact software version, configuration baseline, and the environment the testing will run in.

  • 3

    Roles and responsibilities

    Who executes, who witnesses where required, who reviews, who approves. Named roles, not just departments.

  • 4

    Pre-approval signatures

    Signed and dated before execution begins. A protocol approved after testing is one of the fastest findings an inspector can write.

  • 5

    Acceptance criteria defined in advance

    Each step states its expected result before it is run. 'Works as expected' is not an acceptance criterion.

  • 6

    Deviation handling procedure

    How a failed step is recorded, investigated, assigned an impact and closed.

  • 7

    Traceability reference

    Each test step cites the numbered requirement it verifies, so the RTM can be built from the protocols rather than assembled afterwards.

Apply this on a real systemSee GxP Copilot work on your own URS, or chat with us on WhatsApp.

IQ — Installation Qualification

Proves the thing you tested is the thing you specified. Short, factual, and almost entirely about evidence capture.

  • 8

    Hardware and infrastructure verified

    Servers, storage, network and operating system match the specification and are themselves qualified.

  • 9

    Software version and build recorded

    Exact version, patch level and build number, captured as evidence rather than transcribed.

  • 10

    Installation per vendor instructions

    Evidence the documented installation procedure was followed, including any deviations from it.

  • 11

    Configuration baseline captured

    The applied configuration is recorded in a form you can compare against later.

  • 12

    Interfaces and integrations confirmed

    Connections to other systems are present, authenticated and pointing at the right environments.

  • 13

    Security and access roles installed

    Role definitions and permissions exist as specified before any functional testing.

OQ — Operational Qualification

Tests the functions against the specification under controlled conditions. This is where the bulk of scripted testing sits, and where CSA risk-sizing actually bites.

  • 14

    Functional requirements tested

    Every requirement classified as needing scripted testing has a script, an expected result and a recorded outcome.

  • 15

    Boundary and negative testing

    The system rejects what it should reject. Testing only the happy path is a common and visible gap.

  • 16

    Security and access control testing

    Each role can do what it should and cannot do what it should not, tested rather than asserted.

  • 17

    Audit trail verification

    Entries are generated, capture the previous value, carry user and timestamp, and cannot be disabled by a user.

  • 18

    Electronic signature testing

    Re-authentication, signature meaning, author-cannot-approve-own-work, and record freezing after signature.

  • 19

    Backup and restore tested

    A restore is actually performed and the restored data verified. A backup never tested is not a control.

  • 20

    Alarms, limits and error handling

    The system behaves correctly when something goes wrong, not only when it goes right.

PQ — Performance Qualification

The stage most often weakened into a second OQ. PQ has to look like real operation or it proves nothing new.

  • 21

    Executed in the production environment

    Not in development or a sandbox. Running PQ outside the validated environment is a recurring audit finding.

  • 22

    Real user roles performing real tasks

    Actual trained users running their own workflows end to end, not a validation engineer with an admin account.

  • 23

    Representative data volumes

    Enough data to reflect genuine load. A three-record test proves nothing about a system that will hold three million.

  • 24

    End-to-end business process coverage

    Complete processes across any system boundaries involved, not isolated functions.

  • 25

    Sustained-period observation

    Where the process runs over time, performance is observed across a defined period rather than a single run.

Closing out

  • 26

    Executed protocol reviewed and approved

    Reviewed by QA, with every deviation closed and every attachment present and legible.

  • 27

    Qualification report per stage

    Summarises what was tested, what deviated, how it was resolved, and the conclusion for that stage.

  • 28

    RTM updated

    Coverage reflects actual executed results, including any requirement left untested and the reason.

How to use this

Scale the depth to the GAMP category and the functional risk assessment. A Category 3 non-configured product will not need the OQ depth a Category 5 bespoke system demands, provided the rationale is written down.

Execute in order. IQ before OQ, OQ before PQ, each with its report approved before the next begins. Overlapping stages to save time is the compression that most often has to be redone.

This is a working aid, not a regulatory document, and it does not replace your own quality system procedures.

Explore related resources, products and services: GxP Copilot, TraceDraft, validation services, AI transformation.

IQ templateOQ templatePQ templateIQ OQ PQ templates
FAQ

Common questions

Prefer to talk first? Chat with us on WhatsApp or book a call with an expert.

What is the difference between IQ, OQ and PQ?

IQ confirms the system was installed as designed — correct version, approved configuration, qualified infrastructure. OQ verifies each functional requirement against acceptance criteria defined in advance, under controlled conditions. PQ demonstrates the system performs in the real operational context, with trained users, representative data volumes and genuine end-to-end business processes.

Can IQ, OQ and PQ be combined into one protocol?

For low-risk Category 3 systems a combined IQ/OQ is common and defensible when the validation plan states the rationale. Combining OQ and PQ is harder to defend, because PQ must demonstrate something OQ cannot: real users, real data volumes and real processes in the production environment.

Does PQ have to run in production?

It should run in the validated production environment. Executing PQ in a development or sandbox environment is a recurring audit finding, because the point of PQ is to show the system performs where it will actually be used, with the real configuration, real integrations and real data volumes.

What is the most common IQ/OQ/PQ audit finding?

Protocols approved after execution rather than before. Close behind: acceptance criteria written as 'works as expected', deviations closed without a documented investigation, PQ executed outside the production environment, and screenshots that are illegible or cannot be attributed to who captured them.

How many test scripts does OQ need?

As many as the functional risk assessment calls for, not a fixed number. Requirements scored high risk get scripted scripts with evidence; medium-risk requirements may be covered by unscripted testing with a session record; low-risk requirements may rely on supplier evidence. What makes the number defensible is the written rationale, not the count.

Put this to work on your system.

Bring a URS. We show you risk-sized testing on your own requirements.

  • We reply within one business day
  • We run your URS live on the call
  • You get a clear plan for your system