EU GMP Annex 11 Checklist: Free 45-Point Readiness Check
Check one computerised system against EU GMP Annex 11 in about 10 minutes: 45 questions across 10 domains, each tied to its clause. Get a score, a Red, Amber or Green status per domain and your top 5 gaps.
An EU GMP Annex 11 checklist turns the 17 clauses of Annex 11 (2011) into questions you can answer for one computerised system: is it validated, are suppliers under agreement, is data protected and backed up, do audit trails record and get reviewed, are changes controlled, is access restricted, are electronic signatures linked to records, and can archived data still be retrieved. Answer Yes only where you could show the evidence to an inspector today.
The 45 Annex 11 checks
Each check restates one requirement of EU GMP Annex 11 (revision January 2011) in plain words. Clause numbers refer to that text. The four domains marked data integrity are the ones that most directly protect GMP data.
01 Principle and risk management
Annex 11 clause Principle, 1.
- 1
Is every GMP computerised application validated and its IT infrastructure qualified?
Cl. PrincipleIf not: List every GMP application and the infrastructure it runs on, and schedule validation or qualification for each one without a current record.
- 2
Where a system replaced a manual step, have you shown that quality, process control and overall risk are no worse?
Cl. PrincipleIf not: For each manual step a system replaced, write a short comparison showing quality, process control and risk are no worse, and file it with the validation.
- 3
Is risk management applied across the whole system lifecycle, covering patient safety, data integrity and product quality?
Cl. 1If not: Add patient safety, data integrity and product quality to the risk assessment template and revisit it at each lifecycle stage, not only at go-live.
- 4
Is the extent of validation and of data integrity controls set by a justified, documented risk assessment?
Cl. 1If not: Record, per system or function, the risk decision that sets how much validation and which data integrity controls apply, with the reason.
02 Personnel
Annex 11 clause 2.
- 5
Do process owner, system owner, Qualified Persons and IT work together with defined responsibilities?
Cl. 2If not: Name the process owner, system owner, QP contact and IT owner for each system and write their responsibilities into the system's governance document.
- 6
Do users have the right qualifications and access levels for their role?
Cl. 2If not: Map roles to required training and access levels, and check current users against that map before the next access review.
03 Suppliers and service providers
Annex 11 clause 3.1 to 3.4.
- 7
Are there formal agreements with third parties, including internal IT, that state each party's responsibilities?
Cl. 3.1If not: Put a written agreement in place with each supplier and with internal IT that states who is responsible for what, including data and backups.
- 8
Are suppliers selected on competence and reliability, with the need for an audit decided by risk?
Cl. 3.2If not: Add a documented supplier assessment to selection, and record a risk-based decision on whether an audit is needed.
- 9
Has documentation for off-the-shelf products been reviewed to confirm it meets your user requirements?
Cl. 3.3If not: Review the vendor documentation for each commercial product against your user requirements and record the gaps and how they are covered.
- 10
Can supplier quality and audit information be shown to an inspector on request?
Cl. 3.4If not: Keep supplier assessments, audit reports and quality agreements in one controlled place that can be retrieved during an inspection.
04 Validation
Annex 11 clause 4.1 to 4.8.
- 11
Does validation cover the relevant lifecycle steps, with standards, protocols and acceptance criteria justified by risk?
Cl. 4.1If not: State in the validation plan which lifecycle steps apply and justify the protocols and acceptance criteria by risk.
- 12
Do validation records include change control records (if applicable) and reports on deviations found?
Cl. 4.2If not: Link change control records and deviation reports into the validation package so the record is complete on its own.
- 13
Is there an up-to-date inventory of systems and their GMP functions?
Cl. 4.3If not: Build a system inventory with each system's GMP functions and keep it current through change control.
- 14
Does each critical system have a current description of data flows, interfaces, prerequisites and security?
Cl. 4.3If not: Write a system description for each critical system covering data flows, interfaces, prerequisites and security, and review it with each change.
- 15
Are user requirements based on documented risk and GMP impact, and traceable through the lifecycle?
Cl. 4.4If not: Tie each user requirement to its risk and GMP impact and keep a traceability matrix from requirement to test.
- 16
Have you confirmed the system was developed under an appropriate quality system, with the supplier assessed?
Cl. 4.5If not: Obtain evidence of the supplier's development quality system and record your assessment of it.
- 17
For bespoke or customised systems, is quality and performance formally assessed at every lifecycle stage?
Cl. 4.6If not: For custom or customised systems, add a documented quality and performance review at each lifecycle stage.
- 18
Do tests cover parameter limits, data limits and error handling, with automated test tools assessed as adequate?
Cl. 4.7If not: Add tests for parameter limits, data limits and error handling, and document that any automated test tool is fit for use.
- 19
When data is migrated to another format or system, does validation check that values and meaning are unchanged?
Cl. 4.8If not: Validate every data migration with checks that values and their meaning are unchanged, and keep the evidence.
05 Data, accuracy, storage and printouts
Annex 11 clause 5 to 8. Data integrity domain.
- 20
Do systems that exchange data electronically have built-in checks for correct and secure entry and processing?
Cl. 5If not: Add and test checks on each electronic interface for correct and secure transfer, for example counts, checksums or reconciliation.
- 21
Is critical manually entered data checked a second time, by a second person or a validated electronic means?
Cl. 6If not: Identify critical manual entries and add a second-person or validated electronic check for each.
- 22
Is data protected physically and electronically, and checked for accessibility, readability and accuracy across retention?
Cl. 7.1If not: Define physical and electronic protection for stored data and schedule checks that it stays accessible, readable and accurate for the retention period.
- 23
Are regular back-ups taken, with integrity and restore tested at validation and monitored periodically?
Cl. 7.2If not: Test a full restore during validation, then repeat restore tests on a defined schedule and record the results.
- 24
Can clear printed copies of electronic data be produced?
Cl. 8.1If not: Confirm and document how clear printed copies of each record type are produced.
- 25
Do batch release printouts show whether any data has changed since it was first entered?
Cl. 8.2If not: Configure batch release printouts to show whether any data was changed after first entry.
06 Audit trails
Annex 11 clause 9. Data integrity domain.
- 26
Based on risk, does the system keep an audit trail of all GMP-relevant changes and deletions?
Cl. 9If not: Switch on and verify an audit trail for all GMP-relevant changes and deletions, and confirm it cannot be disabled by users.
- 27
Is a reason recorded for each change or deletion of GMP-relevant data?
Cl. 9If not: Make a reason mandatory for each change or deletion of GMP-relevant data.
- 28
Are audit trails available in a readable form and reviewed regularly?
Cl. 9If not: Define a risk-based audit trail review: who reviews, how often, what they look for, and how findings are recorded.
07 Change control and periodic evaluation
Annex 11 clause 10, 11.
- 29
Are changes to systems, including configuration, made only under a defined, controlled procedure?
Cl. 10If not: Bring configuration changes, not only code and upgrades, under the change control procedure.
- 30
Are systems periodically evaluated to confirm they remain validated and GMP compliant?
Cl. 11If not: Set a periodic review cadence per system based on risk and record each review's conclusion on the validated state.
- 31
Does that review cover functionality, deviations, incidents, upgrades, performance, reliability and security?
Cl. 11If not: Add functionality, deviations, incidents, upgrades, performance, reliability and security to the periodic review template.
08 Security and access
Annex 11 clause 12.1 to 12.4. Data integrity domain.
- 32
Do physical and/or logical controls limit system access to authorised people?
Cl. 12.1If not: Restrict access with unique accounts and physical or logical controls, and remove shared logins.
- 33
Is the level of security matched to how critical the system is?
Cl. 12.2If not: Document a security level per system based on its criticality and close any controls that fall short.
- 34
Are creation, change and removal of user access recorded?
Cl. 12.3If not: Record every creation, change and removal of user access, and review the record periodically.
- 35
Does the system record who entered, changed, confirmed or deleted data, with date and time?
Cl. 12.4If not: Confirm the system records the user identity, date and time for every entry, change, confirmation and deletion.
09 Incidents, e-signatures and batch release
Annex 11 clause 13 to 15. Data integrity domain.
- 36
Are all incidents, not only failures and data errors, reported and assessed?
Cl. 13If not: Widen the incident procedure to cover all system incidents, not only failures and data errors, and assess each one.
- 37
Is the root cause of critical incidents found and used for corrective and preventive action?
Cl. 13If not: Require a root cause investigation for critical incidents and link it to CAPA.
- 38
Do electronic signatures carry the same weight as handwritten signatures within the company?
Cl. 14aIf not: State in a company policy that electronic signatures carry the same weight as handwritten signatures.
- 39
Is each electronic signature permanently linked to its record?
Cl. 14bIf not: Verify that each electronic signature is permanently linked to its record and cannot be copied or moved to another.
- 40
Does each electronic signature include the date and time it was applied?
Cl. 14cIf not: Confirm every electronic signature shows the date and time it was applied, on screen and in printouts.
- 41
Can only Qualified Persons certify batch release in the system, identified by electronic signature?
Cl. 15If not: Restrict batch certification in the system to Qualified Persons and require their electronic signature.
10 Business continuity and archiving
Annex 11 clause 16, 17.
- 42
Are fallback arrangements (manual or alternative system) for critical processes documented and tested?
Cl. 16If not: Document the fallback for each critical process and test it, then record the test.
- 43
Is the time allowed to switch to the fallback based on risk?
Cl. 16If not: Set the maximum time to switch to each fallback from a risk assessment and write it into the continuity plan.
- 44
Is archived data checked for accessibility, readability and integrity?
Cl. 17If not: Schedule checks that archived data is still accessible, readable and intact, and record them.
- 45
When a system changes, is the ability to retrieve archived data ensured and tested?
Cl. 17If not: Add a test that archived data can still be retrieved to the change control checklist for system changes.
How the scoring works
Each check scores 1 for Yes, 0.5 for Partly and 0 for No, so the overall score is out of 45. Each domain gets a status:
- Green: every answer in the domain is Yes.
- Amber: one No, or some Partly answers. Give each one an owner and a date.
- Red: two or more No answers, or any No in a data integrity domain.
Act on Red domains first, then Amber. Re-run the check once the actions are closed.
Two common situations
Moving instruments or systems to a new site
Requalification is the easy part. The risk is losing data history, audit trails or the ability to retrieve old records once the system runs somewhere new. Start with checks 13, 14, 19, 23, 29, 42 and 45.
Selecting a CDMO or service partner
Their computerised systems hold your GMP data, so check how they control and evidence it before you sign, not after the first batch. Start with checks 7, 8, 10, 26, 28, 35 and 39.
Annex 11 now, and the 2025 draft
The version in force is EU GMP Annex 11, revision January 2011, in operation since 30 June 2011, and it is the version the European Commission still lists as current. The Commission consulted on a revised Annex 11 between July and October 2025, alongside a new draft Annex 22 on artificial intelligence. Neither draft is in force. This checklist follows the 2011 text; when a final revision is published, the checks will be updated. Our Annex 11 and Annex 22 guide covers what the drafts propose, and the 21 CFR Part 11 checklist runs the same check against the US rule.
A practical aid for self-assessment. It is not regulatory or legal advice and does not replace the official text, your own procedures or a qualified compliance review.
Sources
Primary documents referred to on this page, from their official publishers.
- 21 CFR Part 11: Electronic Records; Electronic Signatures · eCFR (US)
- EudraLex Volume 4: EU Good Manufacturing Practice guidelines · European Commission
- EU GMP Annex 11: Computerised Systems (current version) · European Commission
What is EU GMP Annex 11?
Annex 11 is the part of the EU GMP Guidelines (EudraLex Volume 4) that covers computerised systems used in GMP activities. It sets expectations for risk management, suppliers, validation, data integrity, audit trails, change control, security, electronic signatures, business continuity and archiving. The current text is the January 2011 revision, in operation since 30 June 2011.
Is there a new version of Annex 11?
The European Commission consulted on a revised Annex 11 between July and October 2025. It is a draft and not in force. Until the Commission publishes a final text, inspections are against the 2011 version, which is what this checklist uses. Check the Commission's EudraLex page for updates.
How is the readiness score calculated?
Each of the 45 checks scores 1 for Yes, 0.5 for Partly and 0 for No. A domain is Green when every answer is Yes, Red when it has two or more No answers or any No in one of the four data integrity domains, and Amber otherwise. The overall score is the total as a percentage of 45.
Which Annex 11 domains matter most for data integrity?
Four domains most directly protect data integrity: data, accuracy, storage and printouts (clauses 5 to 8), audit trails (clause 9), security and access (clause 12), and incidents, electronic signatures and batch release (clauses 13 to 15). A single No in any of these turns the domain Red.
Does Annex 11 apply to cloud and SaaS systems?
Yes. Annex 11 applies to computerised systems used as part of GMP activities wherever they run. For cloud and SaaS systems the supplier clauses (3.1 to 3.4) matter most: a written agreement on responsibilities, a risk-based supplier assessment, and supplier documentation you can show an inspector.
Is this checklist regulatory advice?
No. It restates each Annex 11 requirement in plain words to help you find gaps. It does not replace the official text, your own procedures or a qualified compliance review.