Key takeaway

What the revision is likely to change, what Annex 22 layers on top, and how to prepare a migration plan.

Audit trail
  1. 14:32Signed: Approved for releaseQA Manager
  2. 11:05Changed risk of URS-015Validation lead · Supplier test evidence acceptedMedium → Low
  3. 10:48Edited expected result, OQ-07Validation lead · Lockout after 5 attempts, per URSv3 → v4
  4. 09:12Recorded result, OQ-07Tester · Evidence attachedPassed
Append-only. Entries cannot be edited or deleted.
Who, what, when and whyOn every change
An audit trail an inspector can read: who did what, when, the old and new value and the reason. Entries are append-only and each one is linked to the one before, so a changed or missing entry shows.

EU GMP Annex 11 dates from January 2011. It was written before cloud was a default, before SaaS was how most software is bought, and well before anyone was putting a machine learning model anywhere near a batch decision. A revision has been in consultation since 2025 and has not been adopted — the 2011 text is what applies today.

That creates a planning problem rather than a compliance one. You cannot be cited against a draft, and you also should not design a system in 2026 as though the 2011 assumptions still hold. This is how we read the direction, and what we think is worth changing now regardless of what the final text says.

Where the current text shows its age

Annex 11 as it stands is a short, sensible document whose gaps are all in the same place: it assumes you control the computer.

  • Suppliers and service providers. The text contemplates a supplier who sells you software you then install. It handles far less well a provider who runs the application, holds the data and updates it on their schedule.
  • Cloud and shared infrastructure. There is no real treatment of multi-tenancy, data residency, or qualification of infrastructure you cannot inspect.
  • Change control you do not own. The periodic evaluation and change control expectations assume changes originate with you.
  • Artificial intelligence. Absent, which is why Annex 22 was drafted separately rather than folded in.

None of this makes the current text wrong. It makes it incomplete in a way that inspectors already work around by asking questions the annex does not explicitly require.

What the revision is expected to address

Treat this as direction rather than detail — until the final text is published, specifics can change, and quoting a draft clause as a requirement is how organisations lose credibility with people who know the subject.

The consistent themes across the consultation material and the wider EU GMP programme are: a fuller treatment of suppliers and service providers including cloud, data integrity expectations expressed more explicitly rather than inferred, clearer expectations around periodic review, and a more worked-through position on electronic signatures and audit trail review. Chapter 4 on documentation is being revised alongside it, which matters because the two are read together.

The thing to resist is building a compliance programme against a draft. The thing to avoid is the opposite mistake of waiting, because most of what the revision points at is good practice already.

What to change now, regardless

Everything in this section is defensible under the 2011 text and will remain so under any plausible revision. That makes it low-risk work.

Document the shared responsibility boundary for every cloud system. Who qualifies the infrastructure, who owns configuration, who owns the data, what the vendor tests and what you test. Most organisations have this knowledge distributed across several heads and no document. cloud & SaaS validation is where we write it down, and supplier qualification is where the provider side gets assessed.

Settle the change notification question with each SaaS vendor. How much notice before a production update, whether you can defer or stage it, whether a sandbox receives it first, and what regression evidence they provide. If the answer is little notice and no deferral, your mitigation is monitoring and a defined response — which is acceptable, and has to be a documented decision rather than an unexamined dependency.

Start reviewing audit trails. This is already expected and is the control most often present and unused. A targeted review — changes after approval, changes outside working patterns, repeated invalidations — produces a record that answers the question directly. audit readiness is where we plan it and data integrity (ALCOA+) is the wider practice.

Bring periodic reviews current. An undefined interval is a finding on its own. A defined interval that is routinely missed is worse than a longer one that is kept, which is why periodic review is the obligation we see skipped most.

Where Annex 22 fits

Annex 22 is the separate draft annex written specifically for artificial intelligence. Published for consultation on 7 July 2025, consultation closed that October, and EMA's work plan targets delivering a final text in late 2026. It is not in EudraLex Volume 4 and it is not in force.

Its scope is the part most likely to move, and it moved visibly in October 2026. As drafted it places dynamic, probabilistic and generative models — large language models included — outside its scope and outside critical GMP applications. EMA's workshop report (EMA/156789/2026), published in early October 2026 and covering a workshop held on 30 June, records that consultation comments supported permitting them, that the drafting group has discussed widening the scope provided such models are supported by a fully documented, robust, risk-based control strategy, and that there may be viable pathways. Participants advocated a risk-based, technology-neutral approach in which acceptability turns on intended use, risk and the effectiveness of controls rather than the technology itself. The report's next steps commit to no date, and a revised draft is what to expect next. what EMA's Annex 22 workshop report says goes through it.

The planning implication: if you are deploying AI in a GMP context, design for the assurance elements the draft describes — Annex 22 assurance is how we hold ourselves to them — because they are unlikely to reverse, and do not build a programme that depends on the scope boundary staying where the draft puts it. EU Annex 11 & Annex 22 readiness and the GxP AI hub go into it properly.

How to talk about a draft without overstating it

This is worth being disciplined about, because it is where vendor material routinely misleads. A draft annex is not a requirement. Saying a system must comply with Annex 22 today, or with a revised Annex 11, is inaccurate, and the audience for that claim is exactly the audience that will notice.

The accurate formulation is straightforward: the current Annex 11 text of January 2011 applies; a revision is in consultation and has not been adopted; here is what the draft indicates; here is what we are doing now and why it is defensible under the text that applies.

That version is more persuasive as well as more accurate, which is a happy coincidence rather than a rule. book a demo if you want a system assessed against what actually applies.

Where to go next

Explore GxP Copilot for AI-native validation, TraceDraft for source-traceable clinical documentation, or book a demo to see either on your own data.

See it on your own systemBring a URS or a system. We run GxP Copilot against it live on the call.

Sources

Primary documents referred to on this page, from their official publishers.

EU Annex 11 revisionAnnex 22 preparation

Keep reading

All articles
ValidationDecommissioning a GxP System: Retiring It Without Losing the RecordsSwitching a validated system off is a controlled activity, not an IT task. What has to happen before shutdown, how to keep records retrievable for their full retention period, and why half-retired systems are an inspection risk. · 5 min readManufacturingElectronic Batch Record Validation: GAMP 5 Framework, Risk Assessment, and the IQ/OQ/PQ Protocol That HoldsHow to validate an electronic batch record system under GAMP 5 Second Edition — from URS through risk-based IQ/OQ/PQ, with the data integrity requirements and Part 11 controls that EBR systems demand. · 5 min readELNELN Comparison for Mid-Sized Pharma 2026: Benchling vs Dotmatics vs LabArchives vs Signals NotebookBenchling, Dotmatics, LabArchives and Signals Notebook compared for mid-sized pharma and biotech: strengths, trade-offs, LIMS integration and what drives validation effort. · 5 min readeQMSeQMS comparison: Veeva, MasterControl, Greenlight Guru, QualioHow to pick an eQMS in 2026 — and how to validate whichever one you pick. · 7 min readeQMSValidating an eQMS without re-testing the vendor's softwareValidate an eQMS by relying on the vendor’s evidence for standard functions and testing your own configuration: routing, approvals, signature meanings, migrated records and a routine for cloud releases. · 3 min readAI GovernanceThe EU AI Act and life sciences: less than you fear, plus one thing you missedMost GxP AI is not high-risk under the EU AI Act. Medical device AI and AI used in hiring or performance decisions are, and the AI literacy duty has applied to every company using AI since February 2025. · 3 min readAudit ReadinessFDA Inspection Preparation: The 90-Day Plan From First Signal to Inspector WalkthroughA week-by-week guide to preparing for an FDA inspection — system inventory, audit trail review, deviation closure, training gaps, and the mock-audit protocol that finds problems before inspectors do. · 6 min readFrameworksGAMP 5 Categories Explained: How to Classify Every System in Your GxP LandscapeA clear, practical guide to GAMP 5 software categories — Category 1 through 5, what each means, real examples, and why getting the classification right is the foundation of efficient validation. · 7 min read

Bring a system. We'll show you the package.

Book a demo, or ask a validation lead a quick question on WhatsApp.

  • We reply within one business day
  • We run your URS live on the call
  • You get a clear plan for your system
Chat on WhatsApp

Book a demo

Four fields. The right specialist replies within one business day.

Your details stay private. We never share them.